Successful cases of constant - temperature transportation of precision instruments
Records of rapid customs clearance of heavy machinery at the port
Global Service Network
In-house customs clearance teams at major ports
Overseas technical pre - treatment center
Risk contingency plan system
Response plan for sudden additional tariffs
Rapid response to technical trade measures
Practical case analysis
When a certain automobile manufacturer imported a German stamping production line, due to not paying attention toThe specifications of the equipment foundation boltsThe differences from domestic foundation parameters led to a three - month installation delay. After professional agents intervened in advance:
Coordinated with foreign parties to provide 3D foundation drawings
Arranged for the renovation and construction of domestic embedded parts
Simultaneously handled the temporary import guarantee procedures
Ultimately, it saved a direct economic loss of $1.2 million and avoided order losses caused by the delayed commissioning of the production line.
Prediction of industry regulatory trends in 2025
Based on the latest draft amendment to the Measures for the Administration of Import of Mechanical and Electrical Products:
Second - hand equipment imports need to provideEnergy consumption test reports
Mandatory requirements for precision instrumentsTransportation vibration monitoring data
Implementation of super - large equipmentPre - arrival inspection system at the port of destination